Hopkins Canal Piping Project

May contain: vehicle, transportation, tractor, car, and automobile
Photo of the Hopkins Canal pipe during installation

In 2018, Rogue River Valley Irrigation District (RRVID) began constructing its largest irrigation infrastructure improvement project since the 1950's. The Hopkins Canal Pipeline project converted over 3 miles of open canal, 3 old concrete flumes, and an old inverted siphon to a new pressurized pipeline. The goal was to conserve water instream for fish habitat in the highly productive Rogue River tributary of Little Butte Creek, replace aging, leaky and unsafe infrastructure, to improve conveyance efficiency and to provide clean, pressurized water to over 700 acres of farmland classified as farmland of statewide importance. The project completed all its goals in 2019 for water conservation and conveyance efficiency and is now considered the largest pressurized irrigation pipeline in Jackson County. Many partners were involved in making this project a success of which JSWCD was one; JSWCD provided design, planning, and grant writing assistance.

Bradshaw Drop CIS

May contain: ground, nature, outdoors, field, and grassland
Photo of sprinkler system installed as part of the Bradshaw Drop CIS

At the same time as this project, the Natural Resources Conservation Service and JSWCD developed a Conservation Implementation Strategy (CIS), the Bradshaw Drop Agricultural Water Quality Improvement Project, to address water quality in this area via conversions of flood irrigation to sprinkler or drip irrigation systems. On-farm irrigation improvements were made possible by the installation of the Hopkins Canal Pipeline Project and the delivery of clean, pressurized water to irrigators. 

Antelope Creek Water Quality Monitoring

May contain: water, nature, outdoors, creek, and stream
Antelope Creek monitoring site

In 2017, JSWCD developed our Antelope Creek water quality monitoring program to track water quality parameters before, during, and after the implementation of these projects. Antelope Creek receives flows from the project area and is a tributary to Little Butte Creek, a highly important tributary to the Rogue River for both drinking water and salmon and steelhead habitat; both waterbodies are water quality limited for a variety of factors including sedimentation, bacteria and temperature.

We are excited to see that there has been a 71% reduction in E. coli levels and 27% reduction in total phosphorus in the water since project implementation. For the other parameters, it is too early and there are too many other variables to see evident trends at this time. However, there is a noticeable decrease in flow at one sampling location between 2017-2018 years and 2019-2021 years. This can likely be attributed to the large number of acres that switched from flood irrigation to drip irrigation as well as the installation of the Hopkins Canal Pipeline. This conversion led to more efficient water use, which means less flood irrigation run-off flowing back into Antelope Creek, and therefore less pollutant run-off, including phosphorous and E. coli.

Monitoring will continue here until 2027; updated analysis will be shared as it becomes available.